About Auchinoon Energy Park

Proposed Wind, Solar and Battery Storage Energy Park, located within West Lothian, Scotland

Project overview

Location: approximately 2km south of the centre of Livingston, and approximately 13km west of the City of Edinburgh, wholly within West Lothian Council
Number of Turbines: up to 8 wind turbines
Wind Turbine Tip Height: up to 200 metres
Solar Photovoltaic Array: up to 60 hectares
Battery Energy Storage System (BESS): included as part of the proposed development
Installed Capacity: up to 115.6MW (wind up to 57.6MW / solar up to 58MW)
Expected Production: approximately 246,566 MWh per year — enough to power around 74,199 UK homes, while saving approximately 110,230 tonnes of CO2 per annum*
Lifespan of Energy Park: up to 40 years

 

*Calculated using DESNZ and DUKES 2025 statistics — see the Home page for the full basis of calculation.

Auchinoon Energy Park is currently at the scoping stage

Because the combined generation capacity of Auchinoon Energy Park is expected to exceed 50 megawatts, the project will be determined by the Scottish Ministers under Section 36 of the Electricity Act 1989, rather than by West Lothian Council directly. Eurowind Energy Limited has submitted an Environmental Impact Assessment (EIA) Scoping Report to the Scottish Government's Energy Consents Unit (ECU), requesting a formal Scoping Opinion on the environmental topics to be assessed ahead of a future application for consent.


The Scoping Report can be viewed in the project documents section below.

Public Consultation

Eurowind Energy is committed to meaningful engagement with the local community throughout the development of Auchinoon Energy Park. We will be contacting local community councils to introduce the project and to offer the opportunity to meet and discuss the proposals.


The first round of public exhibitions is planned for September 2026, giving local residents the opportunity to learn about the proposed development directly from the project team and to share feedback that will help shape the design as it develops. A second round of exhibitions, planned for early Spring 2027, will provide an update on the project, explain how feedback has influenced the design, and share further information on community benefits and next steps.

Wednesday 23rd of September - 2pm to 8pm 

West Calder Community Hub, Dickson Street, West Calder, EH55 8DZ


Thursday 24th of September 2026 - 2pm to 8pm

Livingston Cricket Club, 10A Murieston Valley, Livingston, EH54 9HB

This public consultation period will run until the 9th of October, and exhibition materials will be available to download below after the 24th of September. Detailed project information is included within the Scoping Report, avaliavle to view in the 'Project Documents' section below as well as view on the ECU at Scottish Government - Energy Consents Unit - Application Details. 

 